71 MW combined cycle power plant

used Combined heat and power generation plant 71,4 MW Available for sale:

 

Basic details:

 

performance of the gas turbine 41,2 MW

Steam turbine 30,2,MW.

The decommissioning of the took place on 31.12. 2012.

After the last day of commercial operation on 20.12.2012 the plant was hot decommissioned and measures for preservation initiated The power plant is in very good condition.

The power plant has the following main components. 

Frame 6B gas turbine upgraded, total operating hours 90000.

2009 converted to natural gas burner system and the turbine blade replacement.

Since 2009 the plant has 4000 operating hours Generator, Alstom Gt controller system (mark V) Heat recovery boiler, ABB make Steam turbine , double extraction condensation turbine.

Boiler feed water pump 1 and 2 Sulzer 

Cell cooling towers 1 and 2, GEA 

Auxiliary Boiler 20bar,OMICAL 

To see the contact details please Login or Register
Contact Name:Murthy
Company Name:SRI Chakravarthi And Co
Mobile Phone:
Phone: 0091 8662535700
Fax:
Country:
E-Mail:sales@srichakravarthi.com
Web:www.srichakravarthi.com

Comments      Add New Message

Brian Morris
Reply
United States 06.02.2015 21:01:23

I am interested in the 6B CCGT.  Could you pls provide a data sheet which includes year, starts and price.

Thanks you

Brian Morris

 

Leave a Reply


Replace the security code